September 14, 2020
Construction is in full swing for the Kings Crossing extension road connecting to Grand Park Drive, which means that we anticipate some closures in the near future.
Kings Crossing will be closed September 15-18 for paving. A detour will be in place to direct traffic via Lionsgate, Vasquez Road and Forest Trail to the top side of Kings Crossing. Local traffic will be allowed from the top of Kings Crossing to Leland Creek Circle.
Improvements to the railroad crossing at Vasquez Road and Kings Crossing will also take place soon. Vasquez Road will be closed September 21-23 for the work and Kings Crossing will be closed September 23-25.